Industrial Projects

Pueblo West States Avenue Lift Station

  • Installed Utility Transformer
  • Step Down Transformer from a 480V to 208V
  • Installed an RTU with a PLC to Control Pumps
  • SCADA System
  • Pump Control Panel
  • Instrumentation and Controls

ECCV WSD Well WPA-8R

  • Set a VFD
  • Installed a Step-up Transformer
  • Step Down Transformer from 480V to 208V
  • Installed an RTU with a PLC to Control Pumps
  • SCADA System
  • Instrumentation and Controls
  • Installed a Sign Wave Filter
  • Wired a 500HP Pump

City of Louisville Sid Copeland Water Treatment

  • Upgraded Electrical Gear and Generator to 1600A
  • Demoed 800A Switchgear
  • Installed 2 PLC Control Panels with a Fiber optic Loop Between Them
  • Service Upgrade: Switchover with Two Shutdowns